Liberia Energy Project: Evaluation Design for the Liberia Electricity Corporation Training Activity

Liberia Energy Project: Evaluation Design for the Liberia Electricity Corporation Training Activity

Published: Jan 21, 2021
Publisher: Mathematica
Download
Associated Project

Independent Evaluation of the Liberia Energy Project

Time frame: 2017-2025

Prepared for:

Millennium Challenge Corporation

Authors

Poonam Ravindranath

Arif Mamun

In 2018, Millennium Challenge Corporation (MCC) contracted Mathematica to conduct impact and performance evaluations of the Liberia Energy Project. This report describes Mathematica’s evaluation design for Activity 4—the Liberia Electricity Corporation (LEC) Training Activity. The estimated cost of the activity was $5.58 million. MCC reduced the scope of this activity from its original plans, given LEC’s financial status and because of the limited time available for implementation of the activity, which began in 2020 and is scheduled to end in January 2021. The proposed evaluation design is aligned with the revised scope of the activity.

Follow the Evidence

Interested in the most current findings from Mathematica? Subscribe to our bi-weekly newsletter, Evidence & Insights, to stay up to date with the issues that matter to you.

Sign Me Up